Friday, March 31, 2017

Driveway and stucco color coat

It's Friday afternoon and there is lots of progress at the house. The grading and concrete crew is working on the driveway.
Inside the flooring guys are done with the 1st floor of the main house and are now almost done with the 2nd unit.
In the garage the concrete steps for the staircase are still drying. It looks like they will be ready to be installed on Monday.
Most of the floor in the main house is covered with paper, but I found a corner that hadn't been covered yet. The flush baseboards are going in on Monday to finish off the edges.
The electrician has installed LED lights in the garage.
And finally the last white stucco coat is going on. 










No comments:

Post a Comment