Friday, March 31, 2017

Driveway and stucco color coat

It's Friday afternoon and there is lots of progress at the house. The grading and concrete crew is working on the driveway.
Inside the flooring guys are done with the 1st floor of the main house and are now almost done with the 2nd unit.
In the garage the concrete steps for the staircase are still drying. It looks like they will be ready to be installed on Monday.
Most of the floor in the main house is covered with paper, but I found a corner that hadn't been covered yet. The flush baseboards are going in on Monday to finish off the edges.
The electrician has installed LED lights in the garage.
And finally the last white stucco coat is going on. 










Tuesday, March 28, 2017

Flooring - Day two

Ulla stopped by Tuesday afternoon and took a few photos of the flooring progress. Two days after they started.




Monday, March 27, 2017

Flooring installation

Its Monday morning and I just had time to stop by to check in on the build and deliver a few items. Today, the flooring crew began installing the floor downstairs. We think it looks awesome!
There was activity in the garage as well. The concrete contractor is pouring the steps for the staircase.



Saturday, March 25, 2017

General update on bathrooms, tiling, cabinets, etc

It has been a while since we posted anything so we are overdue for an update. Things are progressing fast now. All bathrooms have been tiled and grouted except the 2nd unit bath that they are scheduled to finish early next week. 

In the master bath they have hung the bath vanities and sinks and the tub is ready to be installed. We have chosen to use Ikea cabinets and sinks for all bathrooms, kitchen, mudroom, 2nd unit, etc.
Master bath shower ready for plumbing hardware to be installed.
Niche for shampoo and soap - we chose to do a full tile width so it looks uniform.
The floor upstairs has now been scraped, swept and vacuumed so it's ready for the flooring to go in early next week.
Vanities going in in the upstairs bath. 
All our HVAC equipment has now been installed. Heating and cooling is supplied by a mini-split ducted heat-pump system with a couple of condensers outside hooked up to three individual zones indoors. Instead of the standard grills and vents, we chose to use some long linear slot grills that we felt blended in better with the white ceilings and looked a little better. And the electrician has begun installed LED cans.
Our concrete sub has begun building the forms for the concrete steps for the staircase in the house. The staircase structure is made from steel and the landing zone and steps will be poured onsite next week. We chose to use colored concrete in a dark gray to give an industrial touch to the staircase.
Forms for the steps - ready for the pour.

Kitchen cabinets are all installed and competed now. The gap to the right will house a 24" wide refrigerator column with a custom panel front made of the same black cabinets as the other tall cabinets on that wall. The island with the light blue protective covering on is a high-gloss white finish.
Cabinets in the mudroom - also high gloss white.
And the other side of the mudroom - low cabinets that are ready for the sink and countertop to be installed.
And the second unit kitchenette ready for the sink to be mounted and for the refrigerator and countertop to be installed.
Tile sub is finishing up in the second unit early next week.
Here is the flooring that we are using. A European laminate product in wide planks that mimics a "white stained walnut plank". First time using laminate - we like the look of the flooring and hope it holds up better against UV and fading than our old solid hardwood floor did in the house we came from. The product is from Berry Alloc.












Friday, March 3, 2017

Waterproofing bathrooms, pool tile, stucco and cabinets going in

Lots of progress these last couple of days. These photos are all from today 3/3. All the baths have been waterproofed and the linear drains have been installed.

Ready for floor heating to go in:

Pool crew is working hard on tiling the infinity edge of the pool

Stucco 2nd layer - the brown coat - is being applied. 

And late today the cabinets were put in - not permanently right now. Primarily to check the fit and center them. But it's beginning to look like a kitchen.
Here is the kitchen island
And one side of the mudroom cabinets.











Painting the interior is almost done...

Most of the walls are now done and it's time to paint doors, trim, etc.

The white-balance on all these photos is a bit off - everything is very bright white. Due to the low sun and the plastic on the windows it looks much more yellow in the photos.


We are so happy with how the shadow-gap around the door frames came out. We love it!

During the next week they will be painting the steel staircase.