Friday, August 26, 2016

Framing progress

Framing continues and the first floor is really taking shape now. For the last week or so the crew has been working on framing of roof trusses, overhangs, etc.
Here is the area outside of the main entrance

A view through what will be the main entrance door.

Outside of the main entrance.

Main house framing.

Garage and second unit.

The kitchen.

Main living space with the two-story void framed out as well (top left). That area above the dining table will have a full 18-foot ceiling height.