Sunday, January 15, 2017

Drywall - part three

Another week has gone by and the drywall crew has now moved out of the main house and have hung the garage (see pics later) and started on the second unit.

After the main house drywall was hung we noticed a few things that were corrected this week. In the kitchen we suddenly noticed that some of the LED light cans in the ceiling were slightly off-center and not aligned perfectly with one of the HVAC vents. So we asked them to correct that - it looks great now.

Another thing we noticed was in the mudroom and pantry area. When they hung the ceiling we noticed that the plans called for an 8' ceiling height due to our original plan to use a centralized Zehnder HRV - but now that we have switched to a decentralized Lunos HRV solution, we really didn't need that drop in the ceiling anymore. So after a few quick conversations on options and cost with our GC, we decided to do a change order and have them remove the drywall, bump up the ceiling height to 9' and hang new drywall - all done in a day and SO worth it...

Here are some shots. Downstairs by the floating steel staircase.
A view into the kitchen and dining area:
Here is the main living room
Living room and kitchen area.
Dining area.
The garage:


The beginning of the second unit drywall.

Sunday, January 8, 2017

Drywall continued

Good progress! The sheetrock crew has now been working three full days and they are almost done hanging drywall in the main house. Here are some shots from upstairs near the staircase:

Mudroom and pantry:

They are working on the first floor now:

We can now really get a feeling for how the open "void" in the dining area will feel. Nice open and airy feeling.

Here is a sample of what the shadow gap on top of the flush baseboards and around the door frames will look like. The baseboard is a sample to show the height. The two "z-channel" reglets will be "mudded" over so they will disappear into the white walls. 







Friday, January 6, 2017

Drywall time

It's drywall time... long row of vehicles on the street this morning - lots of people hanging drywall.

Library upstairs

Upstairs hallway

Bedrooms


Master bedroom

Walk-in closet

Master Bath










Tuesday, January 3, 2017

Almost ready for stucco

On the outside the house is not almost completely wrapped in two additional layers: a rain screen and black building paper. That means we have an additional layer of water proofing and will make the house super-duper tight.





Interior doors

Late last week they started installing interior doors. Very thick and solid wood doors where the door frame will be visible and have no trim on it. I'll post some pictures of the gap detail of the door frames later.

These are the last four doors they are installing today before sheetrock starts tomorrow.


Insulation going in

After a successful inspection of all electoral, plumbing and HVAC, the crew has now moved onto insulation. We have chosen to use mineral wool batts. All exterior walls are being insulated with a 7.5" thick R30 Roxul Comfortbatt and we have also chosen to install a Roxul acoustic mineral wool batt in all interior walls. Doing all the interior walls might be a little overkill but we like the sound dampening effect of the insulation and we hope it will create a more quiet house and more relaxing feeling even if there are more people in the house.

Here you can see that they have just started on the exterior walls. They finished it in about 3-4 days - it took 3 tries for the sub to get it just right. First he put in the acoustic batt in the exterior walls, then he put in R23 batts and finally the right R30 batts. House is now almost ready for sheetrock.







Sunday, December 4, 2016

Electrical, plumbing and HVAC progress

The plumbers are still working hard on finalizing plumbing the bathrooms and kitchens as well as the mudroom in the main house. Drain, wall-hung toilet carriers and water is almost done in all rooms.




The electrician has been busy placing all boxes, cans and outlets. We did our first electrical walkthrough last week and there are a few changes that we have asked for.


On the outside of the house, they has placed all mounting brackets for the exterior wall sconces and outlets.




The entire outside of the house is now being prepped to start the stucco work on Monday.